Page 49 - PET worldwide issue 01/2022
P. 49

The new building meets the latest environmental standards, according to Zolux.
             An innovative



             logistics site






             By July, the Zolux Group plans to have a new logistics site that
             meets the latest environmental standards completed for its

             Saint-Bernard subsidiary.


             The French Zolux group is about   cilities. “Our teams were able to   the project is accompanied by
             to launch a new logistics site in   adapt quickly in order to increase   an ecologist in order to propose
             Ablaincourt-Pressoir in the ZAC   the storage area (from the initial   solutions adapted to local bio-
             Haute Picardie dedicated to its   6 000 m² to 12 500 m²) to meet   diversity issues.  “Our company
             subsidiary Saint-Bernard. The   our client’s  expectations  and   is committed to a major CSR
             new building occupies 12 500 m    growth,” explains Claire Rous-  initiative called Horizon, which
                                    2
             and is located directly by the A1   seau at GSE, who is in charge   is based on three pillars: Good
             motorway. Zolux expects that it   of the construction of the new   for my animal, Good in my job
             will be completed in the summer,   complex. The large majority of   and Better for my planet (see
             probably in July.          Saint-Bernard products are man-  PET  worldwide 1/2021).  This
              Since 1954, Saint-Bernard   ufactured in the Péronne factory,   is why we wanted to design a
             has been thinking up, designing,   particularly consumables and   site where the quality of life at
             manufacturing and distributing   hygiene and care products, as   work, environmental quality and
             products for all pets. Distributed   well as food for birds and small   biodiversity are at the heart of
             exclusively through supermar-  mammals.               the project,” explains Damien
             kets, its product ranges are de-                      Thomas, CEO of Saint-Bernard.
             signed to meet all the require-  Modern design          Located halfway between
             ments of owners and their pets.  Designed by Apside Architec-  Amiens and Saint-Quentin, the
                                        ture, the building meets the lat-  logistics platform benefits from
             Bigger storage area        est environmental standards.   a strategic location at the foot
             The logistics building, which   It has been designed to be a   of the A1 motorway, at the heart
             will accommodate the activi-  pleasant place to live for its em-  of a business park serving the
             ties of the site currently based   ployees, is modern and has a   whole of northern France, while
             in Péronne, is a response to the   relaxation room opening onto   being easily accessible from
             group’s desire to reorganise   an outdoor terrace. Aiming to   all major French and European
             and share its current storage fa-  obtain the Bio diverCity label,     cities.    n



             PET worldwide 1|2022                                                                                    49




       PWW2022-01_Buch.indb   49                                                                                04.02.2022   09:49:07
   44   45   46   47   48   49   50   51   52   53   54